
Module Truck Systems New Trucks
The truck chassis that are used for cotton
module trucks are special ordered by MTS. Due to normal lead times at the
manufacturing plants, most of the chassis must be ordered four (4) to six (6) months
before we receive them. One of the main specifications that we require in every
chassis we order is the Eaton two speed rear ends. Check out our page on features to find the advantages of this and other MTS features.
MTS builds cotton module trucks with mechanically or hydraulically
driven beds. Check out our pages on mechanical
and hydraulic drives to see which system is best
suited to your needs.